PROJECT DETAILS:  IT INFRASTRUCTURE IMPLEMENTATION

Earlier Customer is on Banking Sector Intranet but after announcing a subsidiary they need a complete Fresh IT Infra setup at new office premises. So we consult to the client for all required things which mandatory as per IT audit & Security

Before

OFFICE USERS AND AREA: There Were 150-200 Users And Its Was 10,000 Sq.Ft Area

New Server Room was required with Fire Proof Gypsum Wall, Fire Proof Tilling, Electric Work, 30 KVA Ups Installation, Plan For Ac & EPABX, and Biometric security

Needed Network Cabling For All Users Desk, Io Port Punching At User Desk, Patch Panel Punching At Server Room, Cisco L3 And L2 Switches Plan For VLAN, FortiGate FG 100E, Firewall Setup With All Receive Policies.

Needed the configuration and deployment of active directory for central management

Needed the configuration of NAS Storage Device For Centrally Data
Storage

Needed to configure Wireless Access Point In Total Office
Premises.

Needed the Configuration and Deployment of Seqrite Admin Console With DLP and Patch Management Features

After

OFFICE USERS AND AREA: There Were 150-200 Users And Its Was 10,000 Sq.Ft Area

BUILD NEW SERVER ROOM: In That, We Have Done Fire Proof Gypsum Wall, Floor Rising With Fire Proof Tiling, Electrical Work, 30 KVA Ups Installation, Plan For Ac & EPABX, And Biometric Security.

NETWORKING: Network Cabling For All Users Desk, Io Port Punching At User Desk, Patch Panel Punching At Server Room, Cisco L3 And L2 Switches Plan For VLAN, FortiGate FG 100E, Firewall Setup With All Receive Policies.

ADS CONFIGURATION – We Have Configure And Deploy Active Directory For Central Management.

DATA STORAGE – We Also Configure NAS Storage Device For Centrally Data Storage.

WIFI SETUP – We Configure 6 Nos Of Rucks Access Point In Total Office Premises.

EDR SETUP – Configure And Deploy Sarite Admin Console With DLP  And Patch Management Features

Client name will not disclose as per NDA

PROJECT DETAILS:  IT INFRASTRUCTURE IMPLEMENTATION

Clients is in Pharma Sector Earlier Customer working on unsecured IT Infra Setup, caused they face lots of issues in Local connectivity as well as virus issue, License Compliances

Before

-Network Rack Re-dressing was required

-Needed the configuration of Cisco Management Switch

-Needed the V-LAN setup and configuration of CISCO Wireless Access Points, and the Configuration Of NAS Storage

-Needed the Configuration of Active Directory Server with Clients Roaming Profile, Endpoint Antivirus Server, and Auto Backup Scheduler

After

NETWORK RACK RE-DRESSING: We Have Done Network Rack Dressing.

VLAN CONFIGURATION: Configuring Of CISCO Managed Switch

-With V-LAN Setup, Configuring Of CISCO Wireless Access Points, Configuring Of Netgear NAS Storage,

Configuring Of Active Directory Server With Clients Roaming Profile, Seqrite Endpoint Antivirus Server, Auto Backup Scheduler.

Client name will not disclose as per NDA

PROJECT DETAILS: NETWORK INFRASTRUCTURE REVAMP – FOR PAN INDIA BRANCHES

Client is in Banking Sector need to revamp of Network & Server Rooms for all 120 Nos. of PAN India Branches, as its messed with the unmanaged cabling & old unmanaged network switches

Before

-Needed the replacement of existing patch cords With color
code

-Needed the Redressing of the Network Cables

-Needed the Numbering and tagging of all ports

-Needed the installation of new Manageable Network Switches(CISCO)

After

NETWORK RACK RE-DRESSING : First We Are Noting Down Existing Ports And Connectivity Of Local Network

-Re-Dressing Of Network Cables

-Replacement Of Existing Patch Cords With Color Code

-Numbering And Tagging Of All Ports

-Installation Of New Manageable Network Switches (CISCO)

Client name will not disclose as per NDA

PROJECT DETAILS: IT INFRASTRUCTURE NETWORK, ADS AND STORAGE IMPLEMENTATION

Earlier Customer majorly working on Banking Intranet, but after expansion of business they need a secure internet & intranet setup for their own network, so we consult & setup following

Before

-Needed the configuration of CISCO NEXUS switch, also needed the L3 switch for multiple segment of VLAN and also needed the configuration of CISCO L2 Switches for user segments

-Needed the configuration of Fortigate FG 100F Firewall with multiple WAN and VLAN

-Also needed the deployment of Microsoft Hyper Visor for Windows and Linux Servers

-Needed the Configuration and deployment of Seqrite Admin Console with DLP and Patch Management Features

-Needed the configuration and deployment of active directory for central management

-Needed the configuration of NAS Storage Device For Centrally Data Storage

After

VLAN CONFIGURATION: Configure CISCO NEXUS – L3 Switch for
multiple segments of VLAN. Configure CISCO L2 Switches for user
segments

FIREWALL CONFIGURATION: Configure Fortigate FG 100F Firewall with multiple WAN And VLAN Configuration

HYPER-V CONFIGURATION: Deploy Microsoft Hyper Visor for windows and Linux servers

EDR SETUP: Configure And Deploy Seqrite Admin Console With DLPnn And Patch Management Features.

ADS CONFIGURATION: We Have Configure And Deploy Active Directory For Central Management.

DATA STORAGE: We Also Configure NAS Storage Device For Centrally Data Storage.